BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Advisory Service to Preparation of Structure Plan, Urban Area Plan and Action Area Plan of Mymensingh town Client:Urban Development Directorate

    Client: GoB

    Project Duration: Ongoing

  • Survey and Investigation of Water Resources Management by Mathematical Modeling of Panchagaor, Thakurgaon, Dinajpur & Joypurhat Integrated Agriculture Development Project Areas

    Client: IWM

    Project Duration: Ongoing

  • Hydrological & Morphological Study and IEE of different Bridges in Some Selected Districts under Hydrologiacl and Morphological Study, Economic Analysis, EIA, including Topographical Survey & Design

    Client: LGED

    Project Duration: Ongoing

  • Development of Navigability of two nos. Inland Waterways and one no. Khal connected to Baulia River by dredging.

    Client: BIWTA

    Project Duration: 2009

  • Development of Mathematical Model for the Research on the Effect of Bandalling on River Flow and Morphology.

    Client: RRI

    Project Duration: 2006-2009

  • Use Existing Data on Available Digital Elevation Models to Prepare Usable Tsunami and Storm Surge Inundation Risk Maps for the Entire Coastal Region.

    Client: IWM

    Project Duration: 2009

  • Preparation of look up table and generation of PRECIS scenarios for Bangladesh.

    Client: Climate Change Cell (DoE)

    Project Duration: 2007-2008

  • Estimation of Seepage and Percolation Loss from Irrigation Rice Field.

    Client: IWM

    Project Duration: 2006-2007

  • Advisory Services on Research on the Effect of Bandalling on River Flow and Morphology.

    Client: RRI

    Project Duration: 2005-2008

  • Development of a Base Document in the Backdrop of Climate Change Impacts: Characterizing Bangladesh Country Settings.

    Client: Climate Change Cell (DoE)

    Project Duration: 2007

  • Capnet lecture for training on IWRM.

    Client: BCAS

    Project Duration: 2007

  • EIA of Power Plant Project at Shiddirgang.

    Client: EGCB

    Project Duration: 2006

  • Development Proposal for Uttara Residential Model Town (3rd Phase) Project.

    Client: RAJUK

    Project Duration: 2003-2004.