BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Advisory Service to Preparation of Structure Plan, Urban Area Plan and Action Area Plan of Mymensingh town Client:Urban Development Directorate

    Client: GoB

    Project Duration: Ongoing

  • Survey and Investigation of Water Resources Management by Mathematical Modeling of Panchagaor, Thakurgaon, Dinajpur & Joypurhat Integrated Agriculture Development Project Areas

    Client: IWM

    Project Duration: Ongoing

  • Hydrological & Morphological Study and IEE of different Bridges in Some Selected Districts under Hydrologiacl and Morphological Study, Economic Analysis, EIA, including Topographical Survey & Design

    Client: LGED

    Project Duration: Ongoing

  • Review and Optimization of the irrigation and drainage system of the Teesta Project

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1987-1988.

  • Surface Water Simulation Modeling Program, Master Plan Organization

    Client: Ministry of Irrigation, Water Development and Flood Control, Government of the People's Republic of Bangladesh,

    Project Duration: September 1985 - August 1988.

  • Mathematical model study of the River Karnafuli

    Client: Chittagong Port Aurhority,

    Project Duration: 1984-1986.

  • Study of Shifting Pattern of Jamuna River and Recommendation for Protection to Caissons of the East-West Interconnector, Jamuna River Crossing

    Client: Bangladesh Power Development Board (BPDB),

    Project Duration: 1983-1985.

  • Expert services for civil repair works of the Karnafuli Hydrostation, Kaptai

    Client: Bangladesh Power Development Board (BPDB),

    Project Duration: 1983-1984

  • Modelling of salt water intrusion in the Meghna Delta

    Client: Expert Study Group, Ministry of Agriculture

    Project Duration: 1983

  • Post construction evaluation (Technical) of the Early Implementation Projects

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: Completed in 1983