BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Capacity Enhancement and Establishment of a Technology Adaptation Cycle on Comprehensive Nodi (River) Management

    Client: JICA administered by Pacific Consultants Co. Ltd.

    Project Duration: November 2021 to August 2024

  • Providing Consultancy Services for Early Flood Warning System Including Inundation Forecast in Ganga Basin.

    Client: AECOM Asia Company Limited

    Project Duration: February 2021 - August 2028

  • Consultancy Services for the Hydrological and Morphological Study of 2 (Two) nos of Bridges over different river at Narayanganj and Faridpur Districts

    Client: LGED

    Project Duration: May 2021- June 2023

  • A study on the estimation of forest coverage contribution as a land use to water balance in Bangladesh

    Client: The Compass Program, USAID Bangladesh and US Forest Service International Programs

    Project Duration: April 2023- June 2024

  • Developing a cyclone and storm surge warning and impact model for anticipatory actions prior to an impending cyclonic storm surge event.

    Client: ESDO-FOREWARN Bangladesh

    Project Duration: April 2023- April 2024

  • River crossing Tranmission Line Tower in Padma & Ganges

    Client: PGCB

    Project Duration: 2 years

  • Hydro-Morphology Study of Bridges under Dhaka and Mymensingh Divisions

    Client: LGED

    Project Duration: October 2023 to September 2025

  • Short-term consultancy to assess changes in future GBM basin flows and their uncertainty based on CMIP6 climate projections.

    Client: FRERMIP

    Project Duration: October 2023 to November 2023

  • Short-term consultancy to assess impacts of climate change and anthropogenic change on low flows in the Jamuna River

    Client: FRERMIP

    Project Duration: October 2023 to November 2023

  • Hydrological and Morphological Study of Construction of a Bridge Over the Fuli-mara Bill at ch. 490m Fulimara steel Bridge West Side to Mirzapur Upazila Boundary Road Kaliakoir Upazila, Gazipur District

    Client: LGED

    Project Duration: October 2023 to November 2023

  • Vetting services on the design and drawings for the construction of the ferry ghat and bank erosion measures at the Paturia and Doaulatdia

    Client: BIWTA

    Project Duration: October 2021 - January 2022

  • Sediment prediction and riverbank erosion, and salinity intrusion, groundwater outlook and forecast Under “Consultancy services for development of hydrological services products such as sediment prediction & riverbank erosion, hydrologic drought prediction, salinity intrusion forecast, ground water outlook and forecast, surface water supply outlook etc. and upgrade of existing website to display real time data, products & warnings” project.

    Client: Environment and Infrastructure Management Solution (EIMS)

    Project Duration: July 2022- March 2023

  • IPCC Bangladesh National Report Project

    Client: The Meliore Foundation

    Project Duration: November 2023- December 2023

  • Literature Review and Stakeholder Consultation to Establish a Shared Agenda for Addressing the ‘Build, Neglect, and Rebuild’ Cycle in the Water Sector with a Collaborative Approach in Bangladesh

    Client: META META Research, Netherlands

    Project Duration: October 2023- December 2023

  • Member of IFAD Mission Review Team as ‘Hydrology Expert’

    Client: International Fund for Agricultural Development (IFAD)

    Project Duration: 7 days of 2024

  • Supplementary EIA, Fire and Life Safety Assessment, and Climate Risk Assessment of Potenga Container Terminal

    Client: Red Sea Gateway Terminal (RSGT)

    Project Duration: February 2024 - May 2024

  • Updating the Morphological Study of Padma and Payra Rivers Crossing for Infrastructure Development for Payra-Gopalganj Aminbazar 400kv Double Circuit Transmission line (2nd Phase)

    Client: Bangladesh-China Power Company (Pvt) Limited (BCPCL)

    Project Duration:

  • Morphological Study of Meghna River near Ashuganj Power Transmission Line

    Client: PGCB

    Project Duration: December 2022- February 2023

  • Feasibility Study and Detail Design for Permitting Locomotive and Coaches with Higher Axle Loads Over the Existing Kalurghat Bridge of Bangladesh Railway with Feasible Strengthening Measures as an Interim Alternative until the New Bridge is Constructed

    Client: Bangladesh Railway

    Project Duration: September 2022 - September 2023

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility

    Client: Bangladesh Navy

    Project Duration: March 2020 - September 2023