BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Integrated flood services and climate change adaptation for the Ganges-Brahmaputra-Meghna river basin

    Client: Funded by Alliance of International Science Organizations (ANSO) (Institutional Lead)

    Project Duration: January 2022 - December 2024

  • Remote sensing assessment and capacity building for sustainable development in Hindu Kush Himalayan (HKH) region

    Client: Funded by Chinese Academy of Sciences (CAS) (Institutional Lead).

    Project Duration: January 2022 - December 2022

  • Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)

    Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army

    Project Duration: July 2018 - June 2021

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • National Consultant: Disaster Risk Management (DRM) (extension of UNDP works)

    Client: United Nations Development Programme (UNDP)

    Project Duration: 16 March 2021 - 15 May 2021

  • Building Resilience to Landslides through Land Stabilization, Promotion of Alternative Livelihoods and the Establishment of Early Warning Systems in Cox’s Bazar, Bangladesh

    Client: IUCN

    Project Duration: January 2021 - May 2021

  • Provision of rainfall intensity data and analysis Navy Kutubdia rainfall analysis

    Client: World Bank

    Project Duration: January 2021 - 30 June 2021

  • Hydrological and Morphology Study-Bera bridge over Hurasagar River, under RHD Pabna

    Client: Roads and Highway Department

    Project Duration: 01 July - 15 September 2021

  • Hydrological and Morphological Study for the Construction of 8 Bridges (Package No-CIB-S-61) (with Dept. of WRE)

    Client: Local Government Engineering Department (LGED)

    Project Duration: 13 June - 12 September 2021

  • Hydrological Survey report of the land at Diabari, Uttara, Dhaka

    Client: Grameen Telecom Trust

    Project Duration: 16 June - 15 December 2021

  • Climate Resilient Sustainable Coastal Forestry in Bangladesh

    Client: BRAC University

    Project Duration: October 2019 - November 2021

  • Development of National Assessment of Interlinkages of Gender Equality and Climate Change in Bangladesh

    Client: IUCN and UNWomen

    Project Duration: 15 April - 30 October 2021

  • Hydrological and Morphological Mathematical Modeling Studies for Construction of Bishkhali Bridge on Patuakhali-Amtali-Barguna-Kakchira Road over Bishkhali River

    Client: STUP, India; COWI, UK; DDC and Dev of Bangladesh JV (BBA)

    Project Duration: November 2018 - March 2019

  • Design, Supply, Installation, Testing & Commissioning of 230kV Double Circuit Transmission Line at Rupsha on Turnkey Basis Under NWPGCL

    Client: Southern Engineering and Technology

    Project Duration: January 2021 - March 2021