INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)

    Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army

    Project Duration: July 2018 - June 2021

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Economics of Climate Change Adaptation

    Client: IWM

    Project Duration: 2010

  • Capnet lecture for training on IWRM.

    Client: BCAS

    Project Duration: 2007

  • EIA of Power Plant Project at Shiddirgang.

    Client: EGCB

    Project Duration: 2006

  • Development Proposal for Uttara Residential Model Town (3rd Phase) Project.

    Client: RAJUK

    Project Duration: 2003-2004.

  • Impacts of Sea Level Rise on Land Suitability and Adaptation Options.

    Client: CEGIS

    Project Duration: 2004-2006.

  • Estimation of Seepage and Percolation Loss from Irrigation Rice Field under ‘Groundwater Model Study for Deep Tube Well Installation in Barind Area’.

    Client: Client: IWM

    Project Duration: 2005-2006

  • EIA of Eastern Bypasss.

    Client: CEGIS

    Project Duration: 2005

  • Training Program on Mathematical Modeling for the Research on the Effect of Bandalling on River Flow and Morphology.

    Client: RRI

    Project Duration: 2006

  • Command Area Development of Thakurgaon Irrigation Project.

    Client: IWM

    Project Duration: 2005

  • Advisory services on various projects of CEGIS.

    Client: CEGIS,

    Project Duration: 2004