BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)

    Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army

    Project Duration: July 2018 - June 2021

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Hydro-morphological Study (Part-2) for 63 number of bridges at different locations of Barisal, Khulna, Rajshahi and Rangur Divisions

    Client: Local Government Engineering Department (LGED)

    Project Duration: 22 January 2018 - 21 May 2019

  • Hydro-morphological Study (Part-1) for 80 number of bridges at different locations of Dhaka, Chittagong, Mymensingh and Sylhet Divisions

    Client: Local Government Engineering Department (LGED)

    Project Duration: 16 November 2017 - 15 November 2019

  • Hydrological and Morphological study of bridges on (i) Hemayetpur Bazar UP Road under Upazila Savar, Dhaka and (ii) on Nayanagar-Hasnabad over Ichamati River under Upazila Nawabganj, Dhaka

    Client: Local Government Engineering Department (LGED)

    Project Duration: 7 April - 31 December 2019

  • Development of the Integrated Drainage Plan and Detail Design (IDPDD) for Bagerhat and Patuakhali Pourashava, under Coastal Towns Environmental Infrastructure Project (CTEIP)

    Client: Local Government Engineering Department (LGED)

    Project Duration: July 2019 - June 2020

  • Hydrological & Morphological study and Environmental Impact Assessment of 275m long Bridge on Jagannathganj Ghat Bazar to Guakhara Damodarpur Road, Upazila: Sharishabari, District: Jamalpur

    Client: Local Government Engineering Department (LGED)

    Project Duration: 17 May 2020 - 16 July 2020

  • Review of the Hydro-morphological Study of the 1490m Teesta Bridge under Construction Focusing River Training Works (RTW) at Sundarganj Upazila, Gaibandha District under “Construction of 1490m Long PC Bridge on Panchpir Bazar – chilmari Upazila Head Quarter Road over the Teesta River at Sundarganj Upazila under Gaibandha

    Client: JV of SIYUAN-DUCT

    Project Duration: 10 January 2021 - 09 February 2021

  • Community Focused Guideline Development of Bandal Installation

    Client: OXFAM

    Project Duration: 23-30 September 2020

  • Hydro-morphological Study of 68 number of bridges (package No FS/18-19/HMS-3) at different locations of Dhaka, Chittagong, Mymensingh, Khulna and Sylhet Divisions

    Client: Local Government Engineering Department (LGED)

    Project Duration: 31 July 2019 - 30 June 2020

  • Feasibility study in terms of hydrology, morphology and water management of proposed three rubber dams on the Narasunda River in Sadar Upazila of Kishoreganj district

    Client: Local Government Engineering Department (LGED)

    Project Duration: 22 December 2020 - 21 March 2021

  • Hydro-Morphology Study- bridge over the river Dakatia under upazila Faridganj, Dist. Chandpur

    Client: Local Government Engineering Department (LGED)

    Project Duration: 31 March 2021 - 30 June 2021