One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Consultancy services on vetting/comments on proposed alternate steel grade from bridge Bangladesh Railway, Rajshahi
Client: Bangladesh Railway
Project Duration:
Development of Master Plan for Payra Port (with Department of Civil Engineering)
Client: Payra Port Authority
Project Duration: July 2019 - June 2021
Developing Institutional Framework for Flood Preparedness Programmes (FPP)
Client: MoDRM under National Resilience Program
Project Duration: November 2019 - October 2021
Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)
Client: Bangladesh Navy
Project Duration:
Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)
Client: Roads and Highway Department
Project Duration: January 2021 - 30 June 2021
Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)
Client: Bangladesh Navy
Project Duration:
Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan
Client: BRAC UDP and Urban Development Directorate, MoHPW
Project Duration: 01 November 2020 - 03 January 2021
Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy
Client: United Nations Development Programme (UNDP)
Project Duration: 26 December 2021 - 31 July 2021
Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh
Client: World Bank
Project Duration: January 2021 - December 2021
“Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project
Client: Department of Forestry
Project Duration: 09 March 2021 - 30 June 2021
Flood frequency analysis for revision of danger levels in Bangladesh, prepared for UNDP project, BGD/88/054
Client: Surface Water Hydrology Directorate of BWDB.
Project Duration: 1994-1995.
Panel of Experts for the Flood Action Plan (FAP), UNDP Project BGD/90/004 and BGD/92/01
Client: Flood Plan Coordination Organization,
Project Duration: 1992-1993.
Multipurpose Cyclone Shelter Programme, UNDP Project, BGD/91/025
Client: Planning Commission, Government of Bangladesh,
Project Duration: 1992-1993.
Manual for land and water use plan
Client: Local Government Engineering Bureau,
Project Duration: 1991.
Surface Water Simulation Modelling Programme: Phase II
Client: United Nations Development Programme (UNDP) and World Bank,
Project Duration: 1990.
Land Use/Water Use Application Model for Upazila Detail Development Plan: Review of Literature and Available Data Base, Rural Employment Sector Programme
Client: Local government Engineering Bureau,
Project Duration: 1990.
Mathematical Model Study of Pussur Sibsa River System and Karnaphuli River Entrance
Client: Ministry of Port and Shipping, Government of the People's Republic of Bangladesh,
Project Duration: 1990 - 1992.
Prefeasibility Study on Gopalganj Area Development Program, Sponsored by Bangladeh – Canada Agriculture Sector Team
Client: Canadian International Development Agency,
Project Duration: 1990.
Pilot Programme to Improve Management of Flood Control, Drainage and Irrigation Projects: Phase I
Client: Bangladesh Water Development Board (BWDB) and The Ford Foundation,
Project Duration: 1989-91.
Review and Optimization of Planning and Design of Irrigation and Drainage System of Teesta Barrage Project
Client: Bangladesh Water Development Board (BWDB),
Project Duration: 1989.