BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • National Consultant: Disaster Risk Management (DRM) (extension of UNDP works)

    Client: United Nations Development Programme (UNDP)

    Project Duration: 16 March 2021 - 15 May 2021

  • Building Resilience to Landslides through Land Stabilization, Promotion of Alternative Livelihoods and the Establishment of Early Warning Systems in Cox’s Bazar, Bangladesh

    Client: IUCN

    Project Duration: January 2021 - May 2021

  • Provision of rainfall intensity data and analysis Navy Kutubdia rainfall analysis

    Client: World Bank

    Project Duration: January 2021 - 30 June 2021

  • Hydrological and Morphology Study-Bera bridge over Hurasagar River, under RHD Pabna

    Client: Roads and Highway Department

    Project Duration: 01 July - 15 September 2021

  • Hydrological and Morphological Study for the Construction of 8 Bridges (Package No-CIB-S-61) (with Dept. of WRE)

    Client: Local Government Engineering Department (LGED)

    Project Duration: 13 June - 12 September 2021

  • Hydrological Survey report of the land at Diabari, Uttara, Dhaka

    Client: Grameen Telecom Trust

    Project Duration: 16 June - 15 December 2021

  • Climate Resilient Sustainable Coastal Forestry in Bangladesh

    Client: BRAC University

    Project Duration: October 2019 - November 2021

  • Development of National Assessment of Interlinkages of Gender Equality and Climate Change in Bangladesh

    Client: IUCN and UNWomen

    Project Duration: 15 April - 30 October 2021

  • Hydrological and Morphological Mathematical Modeling Studies for Construction of Bishkhali Bridge on Patuakhali-Amtali-Barguna-Kakchira Road over Bishkhali River

    Client: STUP, India; COWI, UK; DDC and Dev of Bangladesh JV (BBA)

    Project Duration: November 2018 - March 2019

  • Design, Supply, Installation, Testing & Commissioning of 230kV Double Circuit Transmission Line at Rupsha on Turnkey Basis Under NWPGCL

    Client: Southern Engineering and Technology

    Project Duration: January 2021 - March 2021