One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh
Client: World Bank
Project Duration: January 2021 - December 2021
“Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project
Client: Department of Forestry
Project Duration: 09 March 2021 - 30 June 2021
Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)
Client: Metro Five Consultants Association
Project Duration: October 2020 - September 2021
Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)
Client: International Union for Conservation of Nature (IUCN)
Project Duration: 20 June 2021 - 30 December 2021
Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line
Client: Power Grid Company of Bangladesh
Project Duration: 15 July 2021 - 30 September 2021
Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone
Client: Institute of Water Modelling (IWM)
Project Duration: 01 June 2021 - 30 April 2022
An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions
Client: Bangladesh Water Development Board (BWDB)
Project Duration: 12 October 2021 - 11 October 2022
National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)
Client: United Nations Development Programme (UNDP)
Project Duration: October 2021 - December 2021
Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District
Client: Bangladesh Bridge Authority (BBA)
Project Duration: January 2020 - April 2021
National Consultant: Disaster Risk Management (DRM) (extension of UNDP works)
Client: United Nations Development Programme (UNDP)
Project Duration: 16 March 2021 - 15 May 2021
Building Resilience to Landslides through Land Stabilization, Promotion of Alternative Livelihoods and the Establishment of Early Warning Systems in Cox’s Bazar, Bangladesh
Client: IUCN
Project Duration: January 2021 - May 2021
Provision of rainfall intensity data and analysis Navy Kutubdia rainfall analysis
Client: World Bank
Project Duration: January 2021 - 30 June 2021
Hydrological and Morphology Study-Bera bridge over Hurasagar River, under RHD Pabna
Client: Roads and Highway Department
Project Duration: 01 July - 15 September 2021
Hydrological and Morphological Study for the Construction of 8 Bridges (Package No-CIB-S-61) (with Dept. of WRE)
Client: Local Government Engineering Department (LGED)
Project Duration: 13 June - 12 September 2021
Hydrological Survey report of the land at Diabari, Uttara, Dhaka
Client: Grameen Telecom Trust
Project Duration: 16 June - 15 December 2021
Climate Resilient Sustainable Coastal Forestry in Bangladesh
Client: BRAC University
Project Duration: October 2019 - November 2021
Development of National Assessment of Interlinkages of Gender Equality and Climate Change in Bangladesh
Client: IUCN and UNWomen
Project Duration: 15 April - 30 October 2021
Hydrological and Morphological Mathematical Modeling Studies for Construction of Bishkhali Bridge on Patuakhali-Amtali-Barguna-Kakchira Road over Bishkhali River
Client: STUP, India; COWI, UK; DDC and Dev of Bangladesh JV (BBA)
Project Duration: November 2018 - March 2019
Design, Supply, Installation, Testing & Commissioning of 230kV Double Circuit Transmission Line at Rupsha on Turnkey Basis Under NWPGCL
Client: Southern Engineering and Technology
Project Duration: January 2021 - March 2021