BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • Hydrological and Morphological study and Environmental Impact Assessment including Bathymetric & Topographical Survey of a large Bridge under Upazila: Bhanga, District: Faridpur

    Client: Local Government Engineering Department (LGED)

    Project Duration:

  • Hydro-morphological Study (Part-1) for 80 number of bridges at different locations of Dhaka, Chittagong, Mymensingh and Sylhet Divisions

    Client: Local Government Engineering Department (LGED)

    Project Duration:

  • To Develop Flood Forecast Modelling, Inundation Mapping and Early Warning System Including River and Embankment Survey in Kosi Basin

    Client: AECOM Asia Company Limited

    Project Duration:

  • Feasibility Study in terms of Hydrological and Morphological Study and Environmental Impact Assessment (EIA) including Topographical Survey of Proposed 02 (Two) nos. Bridges at Madaripur District

    Client: Local Government Engineering Department (LGED)

    Project Duration:

  • Hydro-Morphological Study of the Shitalakhya River and Adjoining Area of the river for construction of Bridge at 15th km of Mawna-Sreepur-Kapasia-Arial-Sanmania-Hatirdia-Monohordi road under Gazipur Road Division

    Client: Roads and Highway Department

    Project Duration:

  • Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (MRT Line 1)

    Client: NKDOS consortium led by NIPPON KOEI

    Project Duration:

  • Hydro-morphological Study for Cons- truction of a New Bridge on the Teesta River

    Client: Hifab International AB

    Project Duration:

  • Urban Drainage Design for Gopalganj District Considering Climate Change under Municipal Governance and Services Project

    Client: Local Government Engineering Department (LGED)

    Project Duration:

  • SDG Progress Report, 2018

    Client: United Nations Development Programme (UNDP)

    Project Duration: March - April 2018

  • i) Kuril to Balu River Canal System Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET) ii) Purbachal Expressway System and Internal Bridges Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET)

    Client: RAJUK

    Project Duration: