One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh
Client: World Bank
Project Duration: January 2021 - December 2021
“Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project
Client: Department of Forestry
Project Duration: 09 March 2021 - 30 June 2021
Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)
Client: Metro Five Consultants Association
Project Duration: October 2020 - September 2021
Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)
Client: International Union for Conservation of Nature (IUCN)
Project Duration: 20 June 2021 - 30 December 2021
Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line
Client: Power Grid Company of Bangladesh
Project Duration: 15 July 2021 - 30 September 2021
Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone
Client: Institute of Water Modelling (IWM)
Project Duration: 01 June 2021 - 30 April 2022
An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions
Client: Bangladesh Water Development Board (BWDB)
Project Duration: 12 October 2021 - 11 October 2022
National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)
Client: United Nations Development Programme (UNDP)
Project Duration: October 2021 - December 2021
Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District
Client: Bangladesh Bridge Authority (BBA)
Project Duration: January 2020 - April 2021
Hydrological and Morphological study and Environmental Impact Assessment including Bathymetric & Topographical Survey of a large Bridge under Upazila: Bhanga, District: Faridpur
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydro-morphological Study (Part-1) for 80 number of bridges at different locations of Dhaka, Chittagong, Mymensingh and Sylhet Divisions
Client: Local Government Engineering Department (LGED)
Project Duration:
To Develop Flood Forecast Modelling, Inundation Mapping and Early Warning System Including River and Embankment Survey in Kosi Basin
Client: AECOM Asia Company Limited
Project Duration:
Feasibility Study in terms of Hydrological and Morphological Study and Environmental Impact Assessment (EIA) including Topographical Survey of Proposed 02 (Two) nos. Bridges at Madaripur District
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydro-Morphological Study of the Shitalakhya River and Adjoining Area of the river for construction of Bridge at 15th km of Mawna-Sreepur-Kapasia-Arial-Sanmania-Hatirdia-Monohordi road under Gazipur Road Division
Client: Roads and Highway Department
Project Duration:
Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (MRT Line 1)
Client: NKDOS consortium led by NIPPON KOEI
Project Duration:
Hydro-morphological Study for Cons- truction of a New Bridge on the Teesta River
Client: Hifab International AB
Project Duration:
Urban Drainage Design for Gopalganj District Considering Climate Change under Municipal Governance and Services Project
Client: Local Government Engineering Department (LGED)
Project Duration:
SDG Progress Report, 2018
Client: United Nations Development Programme (UNDP)
Project Duration: March - April 2018
i) Kuril to Balu River Canal System Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET) ii) Purbachal Expressway System and Internal Bridges Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET)
Client: RAJUK
Project Duration: