One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Consultancy services on vetting/comments on proposed alternate steel grade from bridge Bangladesh Railway, Rajshahi
Client: Bangladesh Railway
Project Duration:
Development of Master Plan for Payra Port (with Department of Civil Engineering)
Client: Payra Port Authority
Project Duration: July 2019 - June 2021
Developing Institutional Framework for Flood Preparedness Programmes (FPP)
Client: MoDRM under National Resilience Program
Project Duration: November 2019 - October 2021
Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)
Client: Bangladesh Navy
Project Duration:
Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)
Client: Roads and Highway Department
Project Duration: January 2021 - 30 June 2021
Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)
Client: Bangladesh Navy
Project Duration:
Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan
Client: BRAC UDP and Urban Development Directorate, MoHPW
Project Duration: 01 November 2020 - 03 January 2021
Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy
Client: United Nations Development Programme (UNDP)
Project Duration: 26 December 2021 - 31 July 2021
Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh
Client: World Bank
Project Duration: January 2021 - December 2021
“Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project
Client: Department of Forestry
Project Duration: 09 March 2021 - 30 June 2021
Hydrological and Morphological study under Detailed F/S for Bangabandhu Sheikh Mujib International Airport project
Client: NIPPON KOEI
Project Duration:
To Develop Flood Forecast Modelling, Inundation Mapping and Early Warning System Including River and Embankment Survey in Kosi Basin
Client: AECOM Asia Company Limited
Project Duration:
Design and development of mobile app and web interface for union wise suitable water supply options
Client: Department of Public Health Engineering (DPHE)
Project Duration:
Hydrological, Hydraulic and Drainage Design for 6 Lane Road (48.2 km) from Naojuri to the Manadpur-NI interaction in Dhaka Division
Client: Dhaka Bypass Expressway Development Company Ltd.
Project Duration:
Feasibility Study with ESIA for Resuscitation of Ichamoti River in Pabna District
Client: Bangladesh Water Development Board (BWDB)
Project Duration:
Feasibility Study for Flood Control, Drainage and Irrigation System at Gowainghat in Syllhet District
Client: Bangladesh Water Development Board (BWDB)
Project Duration:
Hydrological and Morphological study and Environmental Impact Assessment of 170 m Bridge at Sunamganj District
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydrological & Morphological Study and Wave and Storm Surge Impact Assessment on proposed 550m PC/Box girder bridge & Viaduct over Feni River on Sonagazi & Mirsharai Economic Zones Connecting Road Project in Sonagzi/ Mirsharai Upazila, District- Feni/Chattogram
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydrological and Morphological study and Environmental Impact Assessment including Bathymetric & Topographical Survey of a large Bridge under Upazila: Bhanga, District: Faridpur
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydro-morphological Study (Part-1) for 80 number of bridges at different locations of Dhaka, Chittagong, Mymensingh and Sylhet Divisions
Client: Local Government Engineering Department (LGED)
Project Duration: