One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh
Client: World Bank
Project Duration: January 2021 - December 2021
“Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project
Client: Department of Forestry
Project Duration: 09 March 2021 - 30 June 2021
Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)
Client: Metro Five Consultants Association
Project Duration: October 2020 - September 2021
Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)
Client: International Union for Conservation of Nature (IUCN)
Project Duration: 20 June 2021 - 30 December 2021
Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line
Client: Power Grid Company of Bangladesh
Project Duration: 15 July 2021 - 30 September 2021
Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone
Client: Institute of Water Modelling (IWM)
Project Duration: 01 June 2021 - 30 April 2022
An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions
Client: Bangladesh Water Development Board (BWDB)
Project Duration: 12 October 2021 - 11 October 2022
National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)
Client: United Nations Development Programme (UNDP)
Project Duration: October 2021 - December 2021
Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District
Client: Bangladesh Bridge Authority (BBA)
Project Duration: January 2020 - April 2021
Hydro-Morphological study for Constructing three bridges over the Dhaleswari, Ichamati and Madhumati rivers at 1st and 2nd km of the Keraniganj (Syedpur) – Hasara – Birtara – Singpara – Kajaalpur – Nagerhar Road (Z-8203)
Client: Roads and Highway Department
Project Duration: Two Months
Hydro-morphological Study of Hanging Bridge over Naf River connecting Jaliar Char at Teknaf, Cox’s Bazar
Client: A2Z Technologies Ltd
Project Duration: One Month
World Bank (CEIP and ECRRP) for Short term Specialist Consultant Application
Client: World Bank
Project Duration: 17 December 2017 - 30 June 2018
An Assessment of the detailed hydrological, hydraulic, morphological and climatic variability of the plant site in determining of intake of water maximum temperature and thermal plume modeling for the plant site at Charbetaki, Gazaria, Munshiganj
Client: Orion Group
Project Duration: May - September 2016
Appraisal Mission for Climate Resilience Community Development Project
Client: International Fund for Agricultural Development (IFAD)
Project Duration: 20 Days
Feasibility Study in terms of Hydrological and Morphological Study and Environmental Impact Assessment (EIA) including Topographical Survey of Proposed 01 (One) Bridge at Borobaisdia- Kachiaburia Bazar Road under Rangabali Upazila in Patuakhali District
Client: Local Government Engineering Department (LGED)
Project Duration: Two Months
Advancing Water Security of Marginalized Communities Living along Karnali-Ganges River Basin in Nepal, India and Bangladesh
Client: BRAC University
Project Duration: 15 July - 31 December 2017
Cox’s Bazar Airport Development Project Phase-II (with Department of Civil Engineering, BUET)
Client: Civil Aviation Authority, Bangladesh
Project Duration:
Hydrological and Morphological study using mathematical model for replacemet of Bailey Bridge (Kathoir Bridge) of Madanpur-Derai-Sulla Road) under Sunamganj road Division
Client: Roads and Highway Department
Project Duration: 20 March - 19 May, 2017
Preparation of Development Plan for Benapole-Jessore Highway Corridor
Client: UDD, GoB
Project Duration: June 2015 - March 2016