One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)
Client: Metro Five Consultants Association
Project Duration: October 2020 - September 2021
Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)
Client: International Union for Conservation of Nature (IUCN)
Project Duration: 20 June 2021 - 30 December 2021
Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line
Client: Power Grid Company of Bangladesh
Project Duration: 15 July 2021 - 30 September 2021
Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone
Client: Institute of Water Modelling (IWM)
Project Duration: 01 June 2021 - 30 April 2022
An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions
Client: Bangladesh Water Development Board (BWDB)
Project Duration: 12 October 2021 - 11 October 2022
National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)
Client: United Nations Development Programme (UNDP)
Project Duration: October 2021 - December 2021
Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District
Client: Bangladesh Bridge Authority (BBA)
Project Duration: January 2020 - April 2021
Hydrological and Morphological study under Detailed F/S for Bangabandhu Sheikh Mujib International Airport project
Client: NIPPON KOEI
Project Duration:
To Develop Flood Forecast Modelling, Inundation Mapping and Early Warning System Including River and Embankment Survey in Kosi Basin
Client: AECOM Asia Company Limited
Project Duration:
Design and development of mobile app and web interface for union wise suitable water supply options
Client: Department of Public Health Engineering (DPHE)
Project Duration:
Hydrological, Hydraulic and Drainage Design for 6 Lane Road (48.2 km) from Naojuri to the Manadpur-NI interaction in Dhaka Division
Client: Dhaka Bypass Expressway Development Company Ltd.
Project Duration:
Feasibility Study with ESIA for Resuscitation of Ichamoti River in Pabna District
Client: Bangladesh Water Development Board (BWDB)
Project Duration:
Feasibility Study for Flood Control, Drainage and Irrigation System at Gowainghat in Syllhet District
Client: Bangladesh Water Development Board (BWDB)
Project Duration:
Hydrological and Morphological study and Environmental Impact Assessment of 170 m Bridge at Sunamganj District
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydrological & Morphological Study and Wave and Storm Surge Impact Assessment on proposed 550m PC/Box girder bridge & Viaduct over Feni River on Sonagazi & Mirsharai Economic Zones Connecting Road Project in Sonagzi/ Mirsharai Upazila, District- Feni/Chattogram
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydrological and Morphological study and Environmental Impact Assessment including Bathymetric & Topographical Survey of a large Bridge under Upazila: Bhanga, District: Faridpur
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydro-morphological Study (Part-1) for 80 number of bridges at different locations of Dhaka, Chittagong, Mymensingh and Sylhet Divisions
Client: Local Government Engineering Department (LGED)
Project Duration: