One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Consultancy services on vetting/comments on proposed alternate steel grade from bridge Bangladesh Railway, Rajshahi
Client: Bangladesh Railway
Project Duration:
Development of Master Plan for Payra Port (with Department of Civil Engineering)
Client: Payra Port Authority
Project Duration: July 2019 - June 2021
Developing Institutional Framework for Flood Preparedness Programmes (FPP)
Client: MoDRM under National Resilience Program
Project Duration: November 2019 - October 2021
Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)
Client: Bangladesh Navy
Project Duration:
Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)
Client: Roads and Highway Department
Project Duration: January 2021 - 30 June 2021
Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)
Client: Bangladesh Navy
Project Duration:
Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan
Client: BRAC UDP and Urban Development Directorate, MoHPW
Project Duration: 01 November 2020 - 03 January 2021
Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy
Client: United Nations Development Programme (UNDP)
Project Duration: 26 December 2021 - 31 July 2021
Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh
Client: World Bank
Project Duration: January 2021 - December 2021
“Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project
Client: Department of Forestry
Project Duration: 09 March 2021 - 30 June 2021
To Develop Flood Forecast Modelling, Inundation Mapping and Early Warning System Including River and Embankment Survey in Kosi Basin
Client: AECOM Asia Company Limited
Project Duration:
Feasibility Study in terms of Hydrological and Morphological Study and Environmental Impact Assessment (EIA) including Topographical Survey of Proposed 02 (Two) nos. Bridges at Madaripur District
Client: Local Government Engineering Department (LGED)
Project Duration:
Hydro-Morphological Study of the Shitalakhya River and Adjoining Area of the river for construction of Bridge at 15th km of Mawna-Sreepur-Kapasia-Arial-Sanmania-Hatirdia-Monohordi road under Gazipur Road Division
Client: Roads and Highway Department
Project Duration:
Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (MRT Line 1)
Client: NKDOS consortium led by NIPPON KOEI
Project Duration:
Hydro-morphological Study for Cons- truction of a New Bridge on the Teesta River
Client: Hifab International AB
Project Duration:
Urban Drainage Design for Gopalganj District Considering Climate Change under Municipal Governance and Services Project
Client: Local Government Engineering Department (LGED)
Project Duration:
SDG Progress Report, 2018
Client: United Nations Development Programme (UNDP)
Project Duration: March - April 2018
i) Kuril to Balu River Canal System Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET) ii) Purbachal Expressway System and Internal Bridges Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET)
Client: RAJUK
Project Duration:
Hydro-Morphological study for Constructing three bridges over the Dhaleswari, Ichamati and Madhumati rivers at 1st and 2nd km of the Keraniganj (Syedpur) – Hasara – Birtara – Singpara – Kajaalpur – Nagerhar Road (Z-8203)
Client: Roads and Highway Department
Project Duration: Two Months
Hydro-morphological Study of Hanging Bridge over Naf River connecting Jaliar Char at Teknaf, Cox’s Bazar
Client: A2Z Technologies Ltd
Project Duration: One Month