BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • Economics of Climate Change Adaptation

    Client: IWM

    Project Duration: 2010

  • Capnet lecture for training on IWRM.

    Client: BCAS

    Project Duration: 2007

  • EIA of Power Plant Project at Shiddirgang.

    Client: EGCB

    Project Duration: 2006

  • Development Proposal for Uttara Residential Model Town (3rd Phase) Project.

    Client: RAJUK

    Project Duration: 2003-2004.

  • Impacts of Sea Level Rise on Land Suitability and Adaptation Options.

    Client: CEGIS

    Project Duration: 2004-2006.

  • Estimation of Seepage and Percolation Loss from Irrigation Rice Field under ‘Groundwater Model Study for Deep Tube Well Installation in Barind Area’.

    Client: Client: IWM

    Project Duration: 2005-2006

  • EIA of Eastern Bypasss.

    Client: CEGIS

    Project Duration: 2005

  • Training Program on Mathematical Modeling for the Research on the Effect of Bandalling on River Flow and Morphology.

    Client: RRI

    Project Duration: 2006

  • Command Area Development of Thakurgaon Irrigation Project.

    Client: IWM

    Project Duration: 2005

  • Advisory services on various projects of CEGIS.

    Client: CEGIS,

    Project Duration: 2004