One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Consultancy services on vetting/comments on proposed alternate steel grade from bridge Bangladesh Railway, Rajshahi
Client: Bangladesh Railway
Project Duration:
Development of Master Plan for Payra Port (with Department of Civil Engineering)
Client: Payra Port Authority
Project Duration: July 2019 - June 2021
Developing Institutional Framework for Flood Preparedness Programmes (FPP)
Client: MoDRM under National Resilience Program
Project Duration: November 2019 - October 2021
Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)
Client: Bangladesh Navy
Project Duration:
Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)
Client: Roads and Highway Department
Project Duration: January 2021 - 30 June 2021
Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)
Client: Bangladesh Navy
Project Duration:
Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan
Client: BRAC UDP and Urban Development Directorate, MoHPW
Project Duration: 01 November 2020 - 03 January 2021
Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy
Client: United Nations Development Programme (UNDP)
Project Duration: 26 December 2021 - 31 July 2021
Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh
Client: World Bank
Project Duration: January 2021 - December 2021
“Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project
Client: Department of Forestry
Project Duration: 09 March 2021 - 30 June 2021
Seven bridges Feasibility study project
Client: Local Government Engineering Department (LGED)
Project Duration: December 2016 - May 2017
Hydrological and Modelling support for site slope stabilization work in selected river erosion prove clusters under Kurigram and Gaibandha district in response to NW flood in 2016
Client: ESDO (UNDP)
Project Duration: November 2016 - January 2017
Flood Vulnerability Study at the Proposed Aga Khan School site and Impact Assessment of Proposed Construction on the Surrounding Areas
Client: Shatotto
Project Duration: June - July 2016
Hydrological and Morphological study for Construction of 100.00 m Bridge on Achintapur UP HQ- Bhalukapur Bazar road over Jalburiganga River under Gouripur Upazila, District Mymensingh under Greater Mymensingh Rural Infrastructure Development Project
Client: EPC
Project Duration: October - November 2016
Mid-Term Review of Blue Gold Program
Client: Euroconsult Mot MacDonald
Project Duration: October 2016
Detail design for Climate Resilience Community Development Project
Client: International Fund for Agricultural Development (IFAD)
Project Duration: July - August 2017
Annual Review of Blue-Gold Program
Client: Euroconsult Mot MacDonald
Project Duration: 15 November - 31 December 2017
Morphological Analysis of the Kirtonkhola river at Taltala
Client: Power Grid Company of Bangladesh
Project Duration: 20 July - 3 September 2017
Economics of Climate Change Adaptation
Client: IWM
Project Duration: 2010
Capnet lecture for training on IWRM.
Client: BCAS
Project Duration: 2007