BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • Development of the Knowledge portal on the estuary development, Center for Environmental and Geographical Information Services (CEGIS), Dhaka,

    Client: Center for Environmental and Geographical Information Services (CEGIS)

    Project Duration: 2002

  • Command Area Development of Teesta Barrage Project, Surface Water Modelling Centre (SWMC),

    Client: Surface Water Modelling Centre (SWMC)

    Project Duration: 2001-3

  • Investigation on the Failure of Karchar Haor, Sunamganj,

    Client: Ministry of Water Resources, Government of Bangladesh,

    Project Duration: 2002

  • Computational Framework for WARPO’s Future Strategic Water Resources Planning, Center for Environmental and Geographical Information Services (CEGIS), Dhaka

    Client: Center for Environmental and Geographical Information Services

    Project Duration: December 2001- January 2002,

  • Development of Flood Dynamic Model and Improvement of STREAM Computation Engine, Center for Environmental and Geographical Information Services (CEGIS), Dhaka.

    Client: CEGIS

    Project Duration: July 2000 - January 2002,

  • Manual on Hydrologic and Hydraulic Design of Bridge and Related Infrastructure,

    Client: Surface Water Modeling Center (SWMC), Dhaka,

    Project Duration: 2000 - 2002.

  • Review of World Commission on Dam’s Report of Dams and Development, by Bangladesh Water Partnership (BWP),

    Client: Bangladesh Water Partnership (BWP)

    Project Duration: 2001.

  • Updating of Existing Groundwater and Land Subsidence Model Project, Water and Sewerage Authority, Dhaka (DWASA)

    Client: Water and Sewerage Authority

    Project Duration: June 1999 - December 2000,

  • Hydrological Studies of the Ganges, Brahmaputra and Rivers of the Ganges Dependent Area, OGDA Studies, National Water Management Plan (NWMP), Sir William Halcrow and Partners, 

    Client: National Water Management Plan (NWMP)

    Project Duration: December 1999 -April 2001

  • Learning Lesson of 20 Years of Bangladesh Water Development Board’s Early Implementation Project Experience, Environment and GIS Support Project (EGIS) of Water Resources Planning Organization (WARPO),

    Client: Water Resources Planning Organization (WARPO)

    Project Duration: 1998-99