One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)
Client: Metro Five Consultants Association
Project Duration: October 2020 - September 2021
Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)
Client: International Union for Conservation of Nature (IUCN)
Project Duration: 20 June 2021 - 30 December 2021
Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line
Client: Power Grid Company of Bangladesh
Project Duration: 15 July 2021 - 30 September 2021
Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone
Client: Institute of Water Modelling (IWM)
Project Duration: 01 June 2021 - 30 April 2022
An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions
Client: Bangladesh Water Development Board (BWDB)
Project Duration: 12 October 2021 - 11 October 2022
National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)
Client: United Nations Development Programme (UNDP)
Project Duration: October 2021 - December 2021
Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District
Client: Bangladesh Bridge Authority (BBA)
Project Duration: January 2020 - April 2021
EIA of Power Plant Project at Shiddirgang.
Client: EGCB
Project Duration: 2006
Development Proposal for Uttara Residential Model Town (3rd Phase) Project.
Client: RAJUK
Project Duration: 2003-2004.
Impacts of Sea Level Rise on Land Suitability and Adaptation Options.
Client: CEGIS
Project Duration: 2004-2006.
Estimation of Seepage and Percolation Loss from Irrigation Rice Field under ‘Groundwater Model Study for Deep Tube Well Installation in Barind Area’.
Client: Client: IWM
Project Duration: 2005-2006
EIA of Eastern Bypasss.
Client: CEGIS
Project Duration: 2005
Training Program on Mathematical Modeling for the Research on the Effect of Bandalling on River Flow and Morphology.
Client: RRI
Project Duration: 2006
Command Area Development of Thakurgaon Irrigation Project.
Client: IWM
Project Duration: 2005
Advisory services on various projects of CEGIS.
Client: CEGIS,
Project Duration: 2004
Advisory services to Environmental Impact Assessment of Padma Bridge
Client: Bangladesh Consultants Ltd. (BCL),
Project Duration: 2004
Techno-economic feasibility and environmental assessment of the proposed multi-purpose development of lowlands adjacent to Sonargaon Hotel;
Client: RAJUK,
Project Duration: 2004