BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • Investigation into the damage to the works of contract B2 at Sirajgonj during Monsoon 1998, River Bank Protection Project (RBPP)

    Client: Bangladesh water Development Board (BWDB), Dhaka

    Project Duration: 1998

  • Investigation on LGED Activities Interfering with BWDB Projects,

    Client: Ministry of Water Resources, Government of Bangladesh,

    Project Duration: 1998

  • Evaluation of consultancy proposals on National Water Management Plan

    Client: WARPO, Ministry of Water Resources, Government of Bangladesh,

    Project Duration: 1997

  • Final Evaluation of System Rehabilitation Project of Bangladesh Water Development Board, University of Leeds, U.K.,

    Client: University of Leeds, U.K.

    Project Duration: 1997.

  • Floods loss reduction in Bangladesh: Integrating environmental considerations into economic policy making processes,

    Client: UN-ESCAP, Bangkok

    Project Duration: 1997

  • Numerical modelling in relation to Cyclone Shelter Preparatory Study,

    Client: Danish Hydraulic Institute

    Project Duration: 1996-97

  • Physical model investigations, Jamuna Multipurpose Bridge,Faridpur,

    Client: River Research Institute (RRI),

    Project Duration: 1995-1997.

  • Feasibility study of floating pump station in Ganges-Kobadak project,

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1995-1996

  • Feasibility of Floating Pump in Ganges-Kobadak Irrigation Project

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1996.

  • Appropriate institutional form for Surface Water Modelling Centre, prepared for Surface Water Simulation Modelling Programme-III (SWSMP-III

    Client: Technical Assistance by DANIDA, River Research Institute (RRI),

    Project Duration: 1995.