BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • Pilot Programme to Improve Management of Flood Control, Drainage and Irrigation Projects: Phase I

    Client: Bangladesh Water Development Board (BWDB) and The Ford Foundation,

    Project Duration: 1989-91.

  • Review and Optimization of Planning and Design of Irrigation and Drainage System of Teesta Barrage Project

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1989.

  • Surface Water Simulation Modelling Programme

    Client: United Nations Development Programme (UNDP) and World Bank,

    Project Duration: 1988.

  • Surface Water Simulation Modelling Programme, Phase I, UNDP Project BGD/85/045

    Client: Master Plan Organization, Ministry of Irrigation, Water Development and Flood Control,

    Project Duration: 1986-1988.

  • Review and Optimization of the irrigation and drainage system of the Teesta Project

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1987-1988.

  • Surface Water Simulation Modeling Program, Master Plan Organization

    Client: Ministry of Irrigation, Water Development and Flood Control, Government of the People's Republic of Bangladesh,

    Project Duration: September 1985 - August 1988.

  • Mathematical model study of the River Karnafuli

    Client: Chittagong Port Aurhority,

    Project Duration: 1984-1986.

  • Study of Shifting Pattern of Jamuna River and Recommendation for Protection to Caissons of the East-West Interconnector, Jamuna River Crossing

    Client: Bangladesh Power Development Board (BPDB),

    Project Duration: 1983-1985.

  • Expert services for civil repair works of the Karnafuli Hydrostation, Kaptai

    Client: Bangladesh Power Development Board (BPDB),

    Project Duration: 1983-1984

  • Modelling of salt water intrusion in the Meghna Delta

    Client: Expert Study Group, Ministry of Agriculture

    Project Duration: 1983