One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • Hydrological and Morphological & EIA study of proposed 3 Bridges over different rivers in Rangamati, Chittagong Hill Tracks

    Client: Local Government Engineering Department (LGED)

    Project Duration: June - October 2016

  • Lebukhali Study Project

    Client: Military Institute of Science and Technology (MIST)

    Project Duration: February - December 2016

  • Seven bridges Feasibility study project

    Client: Local Government Engineering Department (LGED)

    Project Duration: December 2016 - May 2017

  • Hydrological and Modelling support for site slope stabilization work in selected river erosion prove clusters under Kurigram and Gaibandha district in response to NW flood in 2016

    Client: ESDO (UNDP)

    Project Duration: November 2016 - January 2017

  • Flood Vulnerability Study at the Proposed Aga Khan School site and Impact Assessment of Proposed Construction on the Surrounding Areas

    Client: Shatotto

    Project Duration: June - July 2016

  • Hydrological and Morphological study for Construction of 100.00 m Bridge on Achintapur UP HQ- Bhalukapur Bazar road over Jalburiganga River under Gouripur Upazila, District Mymensingh under Greater Mymensingh Rural Infrastructure Development Project

    Client: EPC

    Project Duration: October - November 2016

  • Mid-Term Review of Blue Gold Program

    Client: Euroconsult Mot MacDonald

    Project Duration: October 2016

  • Detail design for Climate Resilience Community Development Project

    Client: International Fund for Agricultural Development (IFAD)

    Project Duration: July - August 2017

  • Annual Review of Blue-Gold Program

    Client: Euroconsult Mot MacDonald

    Project Duration: 15 November - 31 December 2017

  • Morphological Analysis of the Kirtonkhola river at Taltala

    Client: Power Grid Company of Bangladesh

    Project Duration: 20 July - 3 September 2017