BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Advisory Service to Preparation of Structure Plan, Urban Area Plan and Action Area Plan of Mymensingh town Client:Urban Development Directorate

    Client: GoB

    Project Duration: Ongoing

  • Survey and Investigation of Water Resources Management by Mathematical Modeling of Panchagaor, Thakurgaon, Dinajpur & Joypurhat Integrated Agriculture Development Project Areas

    Client: IWM

    Project Duration: Ongoing

  • Hydrological & Morphological Study and IEE of different Bridges in Some Selected Districts under Hydrologiacl and Morphological Study, Economic Analysis, EIA, including Topographical Survey & Design

    Client: LGED

    Project Duration: Ongoing

  • Final Evaluation of System Rehabilitation Project of Bangladesh Water Development Board, University of Leeds, U.K.,

    Client: University of Leeds, U.K.

    Project Duration: 1997.

  • Floods loss reduction in Bangladesh: Integrating environmental considerations into economic policy making processes,

    Client: UN-ESCAP, Bangkok

    Project Duration: 1997

  • Numerical modelling in relation to Cyclone Shelter Preparatory Study,

    Client: Danish Hydraulic Institute

    Project Duration: 1996-97

  • Physical model investigations, Jamuna Multipurpose Bridge,Faridpur,

    Client: River Research Institute (RRI),

    Project Duration: 1995-1997.

  • Feasibility study of floating pump station in Ganges-Kobadak project,

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1995-1996

  • Feasibility of Floating Pump in Ganges-Kobadak Irrigation Project

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1996.

  • Appropriate institutional form for Surface Water Modelling Centre, prepared for Surface Water Simulation Modelling Programme-III (SWSMP-III

    Client: Technical Assistance by DANIDA, River Research Institute (RRI),

    Project Duration: 1995.

  • Pilot Programme to Improve Management of Flood Control, Drainage and Irrigation Projects: Phase I

    Client: Bangladesh Water Development Board (BWDB) and The Ford Foundation,

    Project Duration: 1994-95.

  • Surface Water Simulation Modeling Program Phase III, Surface Water Modeling Center, Ministry of Water Resource

    Client: Government of the People's Republic of Bangladesh,

    Project Duration: January 1994 - December 1996.

  • Flood frequency analysis for revision of danger levels in Bangladesh, prepared for UNDP project, BGD/88/054

    Client: Surface Water Hydrology Directorate of BWDB.

    Project Duration: 1994-1995.