One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)

    Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army

    Project Duration: July 2018 - June 2021

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Hydrological and Morphological & EIA study of proposed 3 Bridges over different rivers in Rangamati, Chittagong Hill Tracks

    Client: Local Government Engineering Department (LGED)

    Project Duration: June - October 2016

  • Lebukhali Study Project

    Client: Military Institute of Science and Technology (MIST)

    Project Duration: February - December 2016

  • Seven bridges Feasibility study project

    Client: Local Government Engineering Department (LGED)

    Project Duration: December 2016 - May 2017

  • Hydrological and Modelling support for site slope stabilization work in selected river erosion prove clusters under Kurigram and Gaibandha district in response to NW flood in 2016

    Client: ESDO (UNDP)

    Project Duration: November 2016 - January 2017

  • Flood Vulnerability Study at the Proposed Aga Khan School site and Impact Assessment of Proposed Construction on the Surrounding Areas

    Client: Shatotto

    Project Duration: June - July 2016

  • Hydrological and Morphological study for Construction of 100.00 m Bridge on Achintapur UP HQ- Bhalukapur Bazar road over Jalburiganga River under Gouripur Upazila, District Mymensingh under Greater Mymensingh Rural Infrastructure Development Project

    Client: EPC

    Project Duration: October - November 2016

  • Mid-Term Review of Blue Gold Program

    Client: Euroconsult Mot MacDonald

    Project Duration: October 2016

  • Detail design for Climate Resilience Community Development Project

    Client: International Fund for Agricultural Development (IFAD)

    Project Duration: July - August 2017

  • Annual Review of Blue-Gold Program

    Client: Euroconsult Mot MacDonald

    Project Duration: 15 November - 31 December 2017

  • Morphological Analysis of the Kirtonkhola river at Taltala

    Client: Power Grid Company of Bangladesh

    Project Duration: 20 July - 3 September 2017