BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Integrated flood services and climate change adaptation for the Ganges-Brahmaputra-Meghna river basin

    Client: Funded by Alliance of International Science Organizations (ANSO) (Institutional Lead)

    Project Duration: January 2022 - December 2024

  • Remote sensing assessment and capacity building for sustainable development in Hindu Kush Himalayan (HKH) region

    Client: Funded by Chinese Academy of Sciences (CAS) (Institutional Lead).

    Project Duration: January 2022 - December 2022

  • Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)

    Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army

    Project Duration: July 2018 - June 2021

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • Investigation into the damage to the works of contract B2 at Sirajgonj during Monsoon 1998, River Bank Protection Project (RBPP)

    Client: Bangladesh water Development Board (BWDB), Dhaka

    Project Duration: 1998

  • Investigation on LGED Activities Interfering with BWDB Projects,

    Client: Ministry of Water Resources, Government of Bangladesh,

    Project Duration: 1998

  • Evaluation of consultancy proposals on National Water Management Plan

    Client: WARPO, Ministry of Water Resources, Government of Bangladesh,

    Project Duration: 1997

  • Final Evaluation of System Rehabilitation Project of Bangladesh Water Development Board, University of Leeds, U.K.,

    Client: University of Leeds, U.K.

    Project Duration: 1997.

  • Floods loss reduction in Bangladesh: Integrating environmental considerations into economic policy making processes,

    Client: UN-ESCAP, Bangkok

    Project Duration: 1997

  • Numerical modelling in relation to Cyclone Shelter Preparatory Study,

    Client: Danish Hydraulic Institute

    Project Duration: 1996-97

  • Physical model investigations, Jamuna Multipurpose Bridge,Faridpur,

    Client: River Research Institute (RRI),

    Project Duration: 1995-1997.

  • Feasibility study of floating pump station in Ganges-Kobadak project,

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1995-1996

  • Feasibility of Floating Pump in Ganges-Kobadak Irrigation Project

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1996.

  • Appropriate institutional form for Surface Water Modelling Centre, prepared for Surface Water Simulation Modelling Programme-III (SWSMP-III

    Client: Technical Assistance by DANIDA, River Research Institute (RRI),

    Project Duration: 1995.