One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.
Projects Done
With
1Organizations
Integrated flood services and climate change adaptation for the Ganges-Brahmaputra-Meghna river basin
Client: Funded by Alliance of International Science Organizations (ANSO) (Institutional Lead)
Project Duration: January 2022 - December 2024
Remote sensing assessment and capacity building for sustainable development in Hindu Kush Himalayan (HKH) region
Client: Funded by Chinese Academy of Sciences (CAS) (Institutional Lead).
Project Duration: January 2022 - December 2022
Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)
Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army
Project Duration: July 2018 - June 2021
Development of Master Plan for Payra Port (with Department of Civil Engineering)
Client: Payra Port Authority
Project Duration: July 2019 - June 2021
Developing Institutional Framework for Flood Preparedness Programmes (FPP)
Client: MoDRM under National Resilience Program
Project Duration: November 2019 - October 2021
Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)
Client: Bangladesh Navy
Project Duration:
Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)
Client: Roads and Highway Department
Project Duration: January 2021 - 30 June 2021
Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)
Client: Bangladesh Navy
Project Duration:
Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan
Client: BRAC UDP and Urban Development Directorate, MoHPW
Project Duration: 01 November 2020 - 03 January 2021
Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy
Client: United Nations Development Programme (UNDP)
Project Duration: 26 December 2021 - 31 July 2021
Pilot Programme to Improve Management of Flood Control, Drainage and Irrigation Projects: Phase I
Client: Bangladesh Water Development Board (BWDB) and The Ford Foundation,
Project Duration: 1989-91.
Review and Optimization of Planning and Design of Irrigation and Drainage System of Teesta Barrage Project
Client: Bangladesh Water Development Board (BWDB),
Project Duration: 1989.
Surface Water Simulation Modelling Programme
Client: United Nations Development Programme (UNDP) and World Bank,
Project Duration: 1988.
Surface Water Simulation Modelling Programme, Phase I, UNDP Project BGD/85/045
Client: Master Plan Organization, Ministry of Irrigation, Water Development and Flood Control,
Project Duration: 1986-1988.
Review and Optimization of the irrigation and drainage system of the Teesta Project
Client: Bangladesh Water Development Board (BWDB),
Project Duration: 1987-1988.
Surface Water Simulation Modeling Program, Master Plan Organization
Client: Ministry of Irrigation, Water Development and Flood Control, Government of the People's Republic of Bangladesh,
Project Duration: September 1985 - August 1988.
Mathematical model study of the River Karnafuli
Client: Chittagong Port Aurhority,
Project Duration: 1984-1986.
Study of Shifting Pattern of Jamuna River and Recommendation for Protection to Caissons of the East-West Interconnector, Jamuna River Crossing
Client: Bangladesh Power Development Board (BPDB),
Project Duration: 1983-1985.
Expert services for civil repair works of the Karnafuli Hydrostation, Kaptai
Client: Bangladesh Power Development Board (BPDB),
Project Duration: 1983-1984
Modelling of salt water intrusion in the Meghna Delta
Client: Expert Study Group, Ministry of Agriculture
Project Duration: 1983