BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Integrated flood services and climate change adaptation for the Ganges-Brahmaputra-Meghna river basin

    Client: Funded by Alliance of International Science Organizations (ANSO) (Institutional Lead)

    Project Duration: January 2022 - December 2024

  • Remote sensing assessment and capacity building for sustainable development in Hindu Kush Himalayan (HKH) region

    Client: Funded by Chinese Academy of Sciences (CAS) (Institutional Lead).

    Project Duration: January 2022 - December 2022

  • Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)

    Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army

    Project Duration: July 2018 - June 2021

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • Hydro-Morphological study for Constructing three bridges over the Dhaleswari, Ichamati and Madhumati rivers at 1st and 2nd km of the Keraniganj (Syedpur) – Hasara – Birtara – Singpara – Kajaalpur – Nagerhar Road (Z-8203)

    Client: Roads and Highway Department

    Project Duration: Two Months

  • Hydro-morphological Study of Hanging Bridge over Naf River connecting Jaliar Char at Teknaf, Cox’s Bazar

    Client: A2Z Technologies Ltd

    Project Duration: One Month

  • World Bank (CEIP and ECRRP) for Short term Specialist Consultant Application

    Client: World Bank

    Project Duration: 17 December 2017 - 30 June 2018

  • An Assessment of the detailed hydrological, hydraulic, morphological and climatic variability of the plant site in determining of intake of water maximum temperature and thermal plume modeling for the plant site at Charbetaki, Gazaria, Munshiganj

    Client: Orion Group

    Project Duration: May - September 2016

  • Appraisal Mission for Climate Resilience Community Development Project

    Client: International Fund for Agricultural Development (IFAD)

    Project Duration: 20 Days

  • Feasibility Study in terms of Hydrological and Morphological Study and Environmental Impact Assessment (EIA) including Topographical Survey of Proposed 01 (One) Bridge at Borobaisdia- Kachiaburia Bazar Road under Rangabali Upazila in Patuakhali District

    Client: Local Government Engineering Department (LGED)

    Project Duration: Two Months

  • Advancing Water Security of Marginalized Communities Living along Karnali-Ganges River Basin in Nepal, India and Bangladesh

    Client: BRAC University

    Project Duration: 15 July - 31 December 2017

  • Cox’s Bazar Airport Development Project Phase-II (with Department of Civil Engineering, BUET)

    Client: Civil Aviation Authority, Bangladesh

    Project Duration:

  • Hydrological and Morphological study using mathematical model for replacemet of Bailey Bridge (Kathoir Bridge) of Madanpur-Derai-Sulla Road) under Sunamganj road Division

    Client: Roads and Highway Department

    Project Duration: 20 March - 19 May, 2017

  • Preparation of Development Plan for Benapole-Jessore Highway Corridor

    Client: UDD, GoB

    Project Duration: June 2015 - March 2016