BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Capacity Enhancement and Establishment of a Technology Adaptation Cycle on Comprehensive Nodi (River) Management

    Client: JICA administered by Pacific Consultants Co. Ltd.

    Project Duration: November 2021 to August 2024

  • Providing Consultancy Services for Early Flood Warning System Including Inundation Forecast in Ganga Basin.

    Client: AECOM Asia Company Limited

    Project Duration: February 2021 - August 2028

  • Consultancy Services for the Hydrological and Morphological Study of 2 (Two) nos of Bridges over different river at Narayanganj and Faridpur Districts

    Client: LGED

    Project Duration: May 2021- June 2023

  • A study on the estimation of forest coverage contribution as a land use to water balance in Bangladesh

    Client: The Compass Program, USAID Bangladesh and US Forest Service International Programs

    Project Duration: April 2023- June 2024

  • Developing a cyclone and storm surge warning and impact model for anticipatory actions prior to an impending cyclonic storm surge event.

    Client: ESDO-FOREWARN Bangladesh

    Project Duration: April 2023- April 2024

  • River crossing Tranmission Line Tower in Padma & Ganges

    Client: PGCB

    Project Duration: 2 years

  • Hydro-Morphology Study of Bridges under Dhaka and Mymensingh Divisions

    Client: LGED

    Project Duration: October 2023 to September 2025

  • Short-term consultancy to assess changes in future GBM basin flows and their uncertainty based on CMIP6 climate projections.

    Client: FRERMIP

    Project Duration: October 2023 to November 2023

  • Short-term consultancy to assess impacts of climate change and anthropogenic change on low flows in the Jamuna River

    Client: FRERMIP

    Project Duration: October 2023 to November 2023

  • Hydrological and Morphological Study of Construction of a Bridge Over the Fuli-mara Bill at ch. 490m Fulimara steel Bridge West Side to Mirzapur Upazila Boundary Road Kaliakoir Upazila, Gazipur District

    Client: LGED

    Project Duration: October 2023 to November 2023

  • To Develop Flood Forecast Modelling, Inundation Mapping and Early Warning System Including River and Embankment Survey in Kosi Basin

    Client: AECOM Asia Company Limited

    Project Duration:

  • Feasibility Study in terms of Hydrological and Morphological Study and Environmental Impact Assessment (EIA) including Topographical Survey of Proposed 02 (Two) nos. Bridges at Madaripur District

    Client: Local Government Engineering Department (LGED)

    Project Duration:

  • Hydro-Morphological Study of the Shitalakhya River and Adjoining Area of the river for construction of Bridge at 15th km of Mawna-Sreepur-Kapasia-Arial-Sanmania-Hatirdia-Monohordi road under Gazipur Road Division

    Client: Roads and Highway Department

    Project Duration:

  • Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (MRT Line 1)

    Client: NKDOS consortium led by NIPPON KOEI

    Project Duration:

  • Hydro-morphological Study for Cons- truction of a New Bridge on the Teesta River

    Client: Hifab International AB

    Project Duration:

  • Urban Drainage Design for Gopalganj District Considering Climate Change under Municipal Governance and Services Project

    Client: Local Government Engineering Department (LGED)

    Project Duration:

  • SDG Progress Report, 2018

    Client: United Nations Development Programme (UNDP)

    Project Duration: March - April 2018

  • i) Kuril to Balu River Canal System Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET) ii) Purbachal Expressway System and Internal Bridges Planning, Design and Construction Top Supervision (with Department of Civil Engineering, BUET)

    Client: RAJUK

    Project Duration:

  • Hydro-Morphological study for Constructing three bridges over the Dhaleswari, Ichamati and Madhumati rivers at 1st and 2nd km of the Keraniganj (Syedpur) – Hasara – Birtara – Singpara – Kajaalpur – Nagerhar Road (Z-8203)

    Client: Roads and Highway Department

    Project Duration: Two Months

  • Hydro-morphological Study of Hanging Bridge over Naf River connecting Jaliar Char at Teknaf, Cox’s Bazar

    Client: A2Z Technologies Ltd

    Project Duration: One Month