INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Flood Inundation Study Work for Detail Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project (Line- 5)

    Client: Metro Five Consultants Association

    Project Duration: October 2020 - September 2021

  • Requesting assistance in the development of Climate Scenarios considering future climate change in the Rohingya Refugee camps of Cox’s Bazar and Bhasan Char (Noakhali)

    Client: International Union for Conservation of Nature (IUCN)

    Project Duration: 20 June 2021 - 30 December 2021

  • Morphological Study of the Meghna River around Brahmanbaria-Narshingdi 132 KV Double Circuit Transmission Line

    Client: Power Grid Company of Bangladesh

    Project Duration: 15 July 2021 - 30 September 2021

  • Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone

    Client: Institute of Water Modelling (IWM)

    Project Duration: 01 June 2021 - 30 April 2022

  • An Investigation on the Causes of Embankment Failure (CEF) and Recommendations for Sustainable Solutions

    Client: Bangladesh Water Development Board (BWDB)

    Project Duration: 12 October 2021 - 11 October 2022

  • National Consultant for Developing Project Document (ProDoc) for NRP-II – Ecosystem Restoration – Recovery for DRM under National Resilience Programme (NRP)

    Client: United Nations Development Programme (UNDP)

    Project Duration: October 2021 - December 2021

  • Feasibility Study and Detailed Design for the Construction of an Elevated Expressway/Road from Mithamain Sadar Upazila to Karimganj Upazila via Mithmain Cantonment of Kishoreganj District

    Client: Bangladesh Bridge Authority (BBA)

    Project Duration: January 2020 - April 2021

  • Vetting services on the design and drawings for the construction of the ferry ghat and bank erosion measures at the Paturia and Doaulatdia

    Client: BIWTA

    Project Duration: October 2021 - January 2022

  • Sediment prediction and riverbank erosion, and salinity intrusion, groundwater outlook and forecast Under “Consultancy services for development of hydrological services products such as sediment prediction & riverbank erosion, hydrologic drought prediction, salinity intrusion forecast, ground water outlook and forecast, surface water supply outlook etc. and upgrade of existing website to display real time data, products & warnings” project.

    Client: Environment and Infrastructure Management Solution (EIMS)

    Project Duration: July 2022- March 2023

  • IPCC Bangladesh National Report Project

    Client: The Meliore Foundation

    Project Duration: November 2023- December 2023

  • Literature Review and Stakeholder Consultation to Establish a Shared Agenda for Addressing the ‘Build, Neglect, and Rebuild’ Cycle in the Water Sector with a Collaborative Approach in Bangladesh

    Client: META META Research, Netherlands

    Project Duration: October 2023- December 2023

  • Member of IFAD Mission Review Team as ‘Hydrology Expert’

    Client: International Fund for Agricultural Development (IFAD)

    Project Duration: 7 days of 2024

  • Supplementary EIA, Fire and Life Safety Assessment, and Climate Risk Assessment of Potenga Container Terminal

    Client: Red Sea Gateway Terminal (RSGT)

    Project Duration: February 2024 - May 2024

  • Updating the Morphological Study of Padma and Payra Rivers Crossing for Infrastructure Development for Payra-Gopalganj Aminbazar 400kv Double Circuit Transmission line (2nd Phase)

    Client: Bangladesh-China Power Company (Pvt) Limited (BCPCL)

    Project Duration:

  • Morphological Study of Meghna River near Ashuganj Power Transmission Line

    Client: PGCB

    Project Duration: December 2022- February 2023

  • Feasibility Study and Detail Design for Permitting Locomotive and Coaches with Higher Axle Loads Over the Existing Kalurghat Bridge of Bangladesh Railway with Feasible Strengthening Measures as an Interim Alternative until the New Bridge is Constructed

    Client: Bangladesh Railway

    Project Duration: September 2022 - September 2023

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility

    Client: Bangladesh Navy

    Project Duration: March 2020 - September 2023