BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Padma Bridge Rail Link Project (PBRLP) (with Department of Civil Engineering and Department of Water Resources Engineering)

    Client: Bangladesh Railway through Construction Supervision Consultant (CSC), Bangladesh Army

    Project Duration: July 2018 - June 2021

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Pilot Programme to Improve Management of Flood Control, Drainage and Irrigation Projects: Phase I

    Client: Bangladesh Water Development Board (BWDB) and The Ford Foundation,

    Project Duration: 1994-95.

  • Surface Water Simulation Modeling Program Phase III, Surface Water Modeling Center, Ministry of Water Resource

    Client: Government of the People's Republic of Bangladesh,

    Project Duration: January 1994 - December 1996.

  • Flood frequency analysis for revision of danger levels in Bangladesh, prepared for UNDP project, BGD/88/054

    Client: Surface Water Hydrology Directorate of BWDB.

    Project Duration: 1994-1995.

  • Panel of Experts for the Flood Action Plan (FAP), UNDP Project BGD/90/004 and BGD/92/01

    Client: Flood Plan Coordination Organization,

    Project Duration: 1992-1993.

  • Multipurpose Cyclone Shelter Programme, UNDP Project, BGD/91/025

    Client: Planning Commission, Government of Bangladesh,

    Project Duration: 1992-1993.

  • Manual for land and water use plan

    Client: Local Government Engineering Bureau,

    Project Duration: 1991.

  • Surface Water Simulation Modelling Programme: Phase II

    Client: United Nations Development Programme (UNDP) and World Bank,

    Project Duration: 1990.

  • Land Use/Water Use Application Model for Upazila Detail Development Plan: Review of Literature and Available Data Base, Rural Employment Sector Programme

    Client: Local government Engineering Bureau,

    Project Duration: 1990.

  • Mathematical Model Study of Pussur Sibsa River System and Karnaphuli River Entrance

    Client: Ministry of Port and Shipping, Government of the People's Republic of Bangladesh,

    Project Duration: 1990 - 1992.

  • Prefeasibility Study on Gopalganj Area Development Program, Sponsored by Bangladeh – Canada Agriculture Sector Team

    Client: Canadian International Development Agency,

    Project Duration: 1990.