BUET-IWFM

ADVISORY SERVICE

INTRODUCTION

One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Capacity Enhancement and Establishment of a Technology Adaptation Cycle on Comprehensive Nodi (River) Management

    Client: JICA administered by Pacific Consultants Co. Ltd.

    Project Duration: November 2021 to August 2024

  • Providing Consultancy Services for Early Flood Warning System Including Inundation Forecast in Ganga Basin.

    Client: AECOM Asia Company Limited

    Project Duration: February 2021 - August 2028

  • Consultancy Services for the Hydrological and Morphological Study of 2 (Two) nos of Bridges over different river at Narayanganj and Faridpur Districts

    Client: LGED

    Project Duration: May 2021- June 2023

  • A study on the estimation of forest coverage contribution as a land use to water balance in Bangladesh

    Client: The Compass Program, USAID Bangladesh and US Forest Service International Programs

    Project Duration: April 2023- June 2024

  • Developing a cyclone and storm surge warning and impact model for anticipatory actions prior to an impending cyclonic storm surge event.

    Client: ESDO-FOREWARN Bangladesh

    Project Duration: April 2023- April 2024

  • River crossing Tranmission Line Tower in Padma & Ganges

    Client: PGCB

    Project Duration: 2 years

  • Hydro-Morphology Study of Bridges under Dhaka and Mymensingh Divisions

    Client: LGED

    Project Duration: October 2023 to September 2025

  • Short-term consultancy to assess changes in future GBM basin flows and their uncertainty based on CMIP6 climate projections.

    Client: FRERMIP

    Project Duration: October 2023 to November 2023

  • Short-term consultancy to assess impacts of climate change and anthropogenic change on low flows in the Jamuna River

    Client: FRERMIP

    Project Duration: October 2023 to November 2023

  • Hydrological and Morphological Study of Construction of a Bridge Over the Fuli-mara Bill at ch. 490m Fulimara steel Bridge West Side to Mirzapur Upazila Boundary Road Kaliakoir Upazila, Gazipur District

    Client: LGED

    Project Duration: October 2023 to November 2023

  • Flood frequency analysis for revision of danger levels in Bangladesh, prepared for UNDP project, BGD/88/054

    Client: Surface Water Hydrology Directorate of BWDB.

    Project Duration: 1994-1995.

  • Panel of Experts for the Flood Action Plan (FAP), UNDP Project BGD/90/004 and BGD/92/01

    Client: Flood Plan Coordination Organization,

    Project Duration: 1992-1993.

  • Multipurpose Cyclone Shelter Programme, UNDP Project, BGD/91/025

    Client: Planning Commission, Government of Bangladesh,

    Project Duration: 1992-1993.

  • Manual for land and water use plan

    Client: Local Government Engineering Bureau,

    Project Duration: 1991.

  • Surface Water Simulation Modelling Programme: Phase II

    Client: United Nations Development Programme (UNDP) and World Bank,

    Project Duration: 1990.

  • Land Use/Water Use Application Model for Upazila Detail Development Plan: Review of Literature and Available Data Base, Rural Employment Sector Programme

    Client: Local government Engineering Bureau,

    Project Duration: 1990.

  • Mathematical Model Study of Pussur Sibsa River System and Karnaphuli River Entrance

    Client: Ministry of Port and Shipping, Government of the People's Republic of Bangladesh,

    Project Duration: 1990 - 1992.

  • Prefeasibility Study on Gopalganj Area Development Program, Sponsored by Bangladeh – Canada Agriculture Sector Team

    Client: Canadian International Development Agency,

    Project Duration: 1990.

  • Pilot Programme to Improve Management of Flood Control, Drainage and Irrigation Projects: Phase I

    Client: Bangladesh Water Development Board (BWDB) and The Ford Foundation,

    Project Duration: 1989-91.

  • Review and Optimization of Planning and Design of Irrigation and Drainage System of Teesta Barrage Project

    Client: Bangladesh Water Development Board (BWDB),

    Project Duration: 1989.