One of the missions of the Institute is to provide expert advisory services to government and non-government organizations. Through consultancy and advisory services, the Institute has used its experience and expertise in seeking solutions to real life problems. This has allowed the organizations working in relevant fields to use the expertise available at the Institute. The faculty members of the Institute have been involved in over 100 consultancy and advisory services.

3

Projects Done

With

1

Organizations

PROJECT LIST

  • Consultancy services on vetting/comments on proposed alternate steel grade from bridge Bangladesh Railway, Rajshahi

    Client: Bangladesh Railway

    Project Duration:

  • Development of Master Plan for Payra Port (with Department of Civil Engineering)

    Client: Payra Port Authority

    Project Duration: July 2019 - June 2021

  • Developing Institutional Framework for Flood Preparedness Programmes (FPP)

    Client: MoDRM under National Resilience Program

    Project Duration: November 2019 - October 2021

  • Review of Design for BN Naval Base (BNS Shiekh Hasina) (with Department of Civil Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Review of Design for Chittagong- Cox’s Bazar Expressway (with Department of Civil Engineering)

    Client: Roads and Highway Department

    Project Duration: January 2021 - 30 June 2021

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility (with Department of Civil Engineering and Department of Naval Architecture and Marine Engineering)

    Client: Bangladesh Navy

    Project Duration:

  • Carrying Out Climate Inclusive Inundation Modelling for Gaibandha Sadar under Gaibandha Strategic Development Plan

    Client: BRAC UDP and Urban Development Directorate, MoHPW

    Project Duration: 01 November 2020 - 03 January 2021

  • Developing Cyclone Amphan and recent Flooding Recovery Plan and its implementing strategy

    Client: United Nations Development Programme (UNDP)

    Project Duration: 26 December 2021 - 31 July 2021

  • Water Quality Monitoring of water courses located in transboundary/shared catchments in Bangladesh

    Client: World Bank

    Project Duration: January 2021 - December 2021

  • “Feasibility study for installing and operating cable car and preparation of Master Plan for Madhobkundo Eco park” Project

    Client: Department of Forestry

    Project Duration: 09 March 2021 - 30 June 2021

  • Vetting services on the design and drawings for the construction of the ferry ghat and bank erosion measures at the Paturia and Doaulatdia

    Client: BIWTA

    Project Duration: October 2021 - January 2022

  • Sediment prediction and riverbank erosion, and salinity intrusion, groundwater outlook and forecast Under “Consultancy services for development of hydrological services products such as sediment prediction & riverbank erosion, hydrologic drought prediction, salinity intrusion forecast, ground water outlook and forecast, surface water supply outlook etc. and upgrade of existing website to display real time data, products & warnings” project.

    Client: Environment and Infrastructure Management Solution (EIMS)

    Project Duration: July 2022- March 2023

  • IPCC Bangladesh National Report Project

    Client: The Meliore Foundation

    Project Duration: November 2023- December 2023

  • Literature Review and Stakeholder Consultation to Establish a Shared Agenda for Addressing the ‘Build, Neglect, and Rebuild’ Cycle in the Water Sector with a Collaborative Approach in Bangladesh

    Client: META META Research, Netherlands

    Project Duration: October 2023- December 2023

  • Member of IFAD Mission Review Team as ‘Hydrology Expert’

    Client: International Fund for Agricultural Development (IFAD)

    Project Duration: 7 days of 2024

  • Supplementary EIA, Fire and Life Safety Assessment, and Climate Risk Assessment of Potenga Container Terminal

    Client: Red Sea Gateway Terminal (RSGT)

    Project Duration: February 2024 - May 2024

  • Updating the Morphological Study of Padma and Payra Rivers Crossing for Infrastructure Development for Payra-Gopalganj Aminbazar 400kv Double Circuit Transmission line (2nd Phase)

    Client: Bangladesh-China Power Company (Pvt) Limited (BCPCL)

    Project Duration:

  • Morphological Study of Meghna River near Ashuganj Power Transmission Line

    Client: PGCB

    Project Duration: December 2022- February 2023

  • Feasibility Study and Detail Design for Permitting Locomotive and Coaches with Higher Axle Loads Over the Existing Kalurghat Bridge of Bangladesh Railway with Feasible Strengthening Measures as an Interim Alternative until the New Bridge is Constructed

    Client: Bangladesh Railway

    Project Duration: September 2022 - September 2023

  • Technical Support Service for the Engineering, Procurement and Construction Including Installation and Commissioning of a Complete Ship Docking and Repair Facility

    Client: Bangladesh Navy

    Project Duration: March 2020 - September 2023